BML 2015 10 18

Dan came to BML and took down all of the SFC’s and the base of the active collector.  The MIT datalogger was waterlogged and destroyed (along with the data).  Dan observed that both the Chilean and German mesh were oriented 90 degrees from the way they are supposed to (and that had been the way for the full 2 years).  Dan brought back both the German mesh and the Chilean mesh (which had a bent copper square).  Those were given to Alicia for the Open Space Preserve.    The remaining pipes and MIT mesh were left there.  The rain gauges were also brought down to Monterey for calibration.